Werbung
 Übersetzung für 'behind schedule' von Englisch nach Deutsch
behind schedule {adj} {adv}verspätet
behind schedule {adv}hinter dem Zeitplan
behind schedule {adv}später als geplant
behind schedule {adv}hintendran [ugs.]
behind schedule {adv}im Rückstand [Zeitplan]
behind schedule {adv}im Verzug [zeitlich hinter der gesetzten Frist]
3 Wörter
to be behind scheduleVerspätung haben
comm.fin.
to fall behind schedule
hinter dem Zeitplan zurückbleiben
Teiltreffer
scheduleTabelle {f}
106
to scheduleZeitplan festlegen
to schedulezeitlich festlegen
to scheduleplanen
3810
to schedule[in einer Liste, etc.] erfassen
45
admin.
to schedule
ins Programm einstellen [planen]
scheduleAufstellung {f}
126
scheduleAblaufprogramm {n}
39
scheduleAblaufplan {m}
346
educ.
schedule
Terminplaner {m}
118
scheduleZeitplan {m}
3546
to schedule {adv}pünktlich
to schedule {adv}termingemäß
law
schedule
Anhang {m} [z. B. zu einem Gesetz oder Vertrag]
53
scheduleAuflistung {f}
94
to schedulezeitlich einplanen
scheduleListe {f}
106
scheduleÜbersicht {f}
48
schedulePlan {m}
411
scheduleTerminplan {m}
4902
28 Übersetzungen
Neue Wörterbuch-Abfrage: Einfach jetzt tippen!

Anwendungsbeispiele Englisch
  • OpenDoc had a large memory footprint for the time, and since the OS/2 (Warp 4) versions of OpenDoc were behind schedule, Cyberdog only ran on Macintosh.
  • Latour, moving along muddy forest trails amid snow and sleet squalls, fell badly behind schedule.
  • At 4:30 a.m. on 17 December 1944, the 1st SS Panzer Division was approximately 16 hours behind schedule when the convoys departed the village of Lanzerath enroute west to the town of Honsfeld.
  • After falling drastically behind schedule and failing to meet some specifications, in December 2004 the VLT Interferometer became the target of a second ESO "recovery plan".
  • While the site had originally been slated to open by 2020, construction fell behind schedule due to the COVID-19 pandemic and the opening date was delayed to 2023.

  • EVM implementations for large or complex projects include many more features, such as indicators and forecasts of cost performance (over budget or under budget) and schedule performance (behind schedule or ahead of schedule).
  • The events started on February 13, four days behind schedule, because of strong winds and heavy snowfall.
  • With an $890-million contract to build 175 light-rail cars for Metropolitan Transportation Authority that was behind schedule, Kinkisharyo, the El Segundo-based U.S.
  • Because Hans Buhringer (Fritz) was an inexperienced actor and filming was behind schedule, a Native American stuntman was put in a blond wig and equipped with squibs to capture the character's death in one take.
  • The Kemper Project was scheduled to open in the third quarter of 2016, more than two years behind schedule.

  • The Quebec provincial government took over construction when it became evident in 1975 that work had fallen far behind schedule.
  • Its central theme is that adding manpower to a software project that is behind schedule delays it even longer.
  • However, the upgrade project ran over budget and fell behind schedule.
  • If the MIDI data stream is running close to capacity, the MTC data may arrive a little behind schedule which has the effect of introducing a small amount of jitter.
  • This operating system was used as the basis of AmigaDOS (file-related functions of AmigaOS); MetaComCo won the contract from Commodore because the original planned Amiga disk operating system called Commodore Amiga Operating System (CAOS) was behind schedule; timescales were incredibly tight and TRIPOS provided a head start for a replacement system.

  • considered late if they are more than 10 minutes behind schedule, up to 30 minutes for trips over [...] in length.
Werbung
© dict.cc English-German dictionary 2024
Enthält Übersetzungen von der TU Chemnitz sowie aus Mr Honey's Business Dictionary (nur Englisch/Deutsch).
Links auf das Wörterbuch oder auch auf einzelne Übersetzungen sind immer herzlich willkommen!